Scope and drawings
Start with a defined package.
The drawings, existing services and site constraints give the installation its context. Discuss the work required, interfaces with other trades and the records needed for the package.
SF / QUALITY AND DELIVERY
From the agreed scope to the final connections.
Experienced tradespeople, suitable off-site preparation and practical coordination. Our approach is grounded in the installation work we’ve delivered.
Discuss your installation package
PROJECT RECORDSIllustrative index. Actual contents are agreed to suit the contract and SF’s installation scope.
A PRACTICAL APPROACH
The right preparation belongs alongside the work itself. Each package has its own drawings, site conditions and completion requirements.
Scope and drawings
The drawings, existing services and site constraints give the installation its context. Discuss the work required, interfaces with other trades and the records needed for the package.
Preparation and coordination
Identify suitable off-site fabrication, work to the relevant isometric schematics and coordinate workshop stock with suppliers. Plan the equipment and delivery logistics around the site work.
Installation and checks
Complete the agreed installation, connections, testing and snagging. At HubSpot House, our package included filling, testing and snagging after the heating, chilled-water and fan coil unit connections.
Records and handover
Photographic progress and constraint records support the site work. Agree the drawing references, test records and completion information required for each package with the project contractor.
THE APPROACH IN PRACTICE
Off-site preparation at DUB10. Connections, testing and snagging at HubSpot House. Explore SF’s confirmed work on each project.

Data centre
Clondalkin, Dublin
SF’S WORKWater-services installation, plantroom modifications and associated site works at the Clondalkin data-centre campus. All modules within SF’s scope prefabricated off site to isometric schematics, reducing the need for hot work on site and supporting higher safety standards. Our team coordinated delivery logistics and managed workshop stock in liaison with suppliers.
Project contractor: Designer Group
Explore this project
Technology
Sir John Rogerson’s Quay, Dublin
SF’S WORKFan coil unit installations with heating and chilled-water mains, second-fix unit connections and condensate pipework, followed by filling, testing and snagging.
Project contractor: Navio
Explore this projectHubSpot HouseAnthony Woods Photography · HubSpot
Echelon DUB10Echelon Data Centres